Glossary entry

English term or phrase:

PMRF

Arabic translation:

‫مصفاة تشغيل أو معالجة متعددة الدفق

Added to glossary by Hasna Chakir
Jun 8, 2013 19:32
10 yrs ago
1 viewer *
English term

PMRF

English to Arabic Tech/Engineering Petroleum Eng/Sci
Inadequate Preventive Maintenance Programme (The passing valves was not reported to maintenance; Closed drain system had leaked 12 times since 2006.
PMRF raised to replace the closed drain header)
Change log

Jun 13, 2013 07:54: Hasna Chakir Created KOG entry

Discussion

mona elshazly Jun 8, 2013:
is it an incident that took place in America: the only acronyms i could find are as follows:
Pacific Missile Range Facility
Precision Manufacturing Research Facility (University of Alabama)
Sameh Elnokaly (asker) Jun 8, 2013:
No, in one of the UAE oil fields , i also found the same acronyms , but I don't think its related to the subject
mona elshazly Jun 8, 2013:
Is it an incident that took place in America? because the only acronyms I could find that may be suitable for the text are as follows:
Precision Manufacturing Research Facility (University of Alabama)
Pacific Missile Range Facility. Or it could be a name of a company?
Sameh Elnokaly (asker) Jun 8, 2013:
Causes:
 Inadequate Leadership (Deviation from SOP was known but no effective corrective action was taken; Instead of replacing/fixing passing valves, these were kept in closed position; No effective )  Inadequate Preventive Maintenance Programme (Programme (The passing valves was not reported to maintenance; Closed drain system had leaked 12 times since 2006. PMRF raised to replace the closed drain header)
Sameh Elnokaly (asker) Jun 8, 2013:
its related to Loss of containment Incidents and causes :

Incident :
Since 2006, due to corrosion, the closed drain network had leaked 12 times. The drain header is isolated from drain network by closing two manual isolation valves and accordingly the purging fuel gas isolated. Due to passing problems in the Train instruments and process drain valves, these main two manual isolation valves were kept in closed position and these were opened if there was demand to drain. 1st stage level transmitter of train 2 was flushed and transmitter chamber was drained to process drain without lining it up to underground drain header. The process drain line, already subjected to corrosion, was exposed to 18 bar pressure and a leak developed causing activation of H2S alarm. Outcome: The train production was shifted to other trains and started depressurizing the train to flare.

mona elshazly Jun 8, 2013:
Could you give more text is it something pertaining to HSE report or something like that??

Proposed translations

+2
1 hr
Selected

‫مصفاة تشغيل أو معالجة متعددة الدفق

‫Process Multi-Rheo Filter‬
Peer comment(s):

agree mona elshazly
9 hrs
agree titos - trans
18 hrs
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Thank you all :)"
+1
1 hr

برنامج صيانة وقائية غير مناسب للموقف/ خطأ في تنفيذ /خطوات برنامج الصيانة الوقائية

-
Peer comment(s):

agree mona elshazly : what does this acronym stand for??
9 hrs
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search